New build church to replace original church that was destroyed following the Christchurch earthquakes in 2010/11. Construction consists of steel portal frame with concrete wall panels, concrete floor, and lightweight roof. New church is located substantially in the same position as the original church, and will be functionally and structurally connected with the adjacent existing parish centre.
Tool: Green Star NZ Custom Design 2009
Building owner: Catholic Diocese of Christchurch
GSAP: Shaun Mitchell
Project location: 100 Lonsdale Street, New Brighton, Christchurch
Main contractor: TBC
Architect: Paul Foley
Structural engineer: Chris Watson
Civil engineer: Chris Watson
Building services engineer: Thomas Spencer
Acoustic consultant: Stephen Chiles