Three level office building plus 65 car parks in adjacent car parking building
Tool: Green Star NZ Office Built 2009
Building Owner: Calder Stewart Industries Limited
GSAP: Peter Bryant
Project location: 223-231 Tuam Street, Christchurch
Project Manager: Studio D4
Main Contractor: Calder Stewart Construction
Architects: AQUA
Structural Engineer: Holmes Consulting LP
Civil Engineer: Holmes Consulting LP
Building Services Engineer: Thurstons/ECS/HSC
Acoustic Consultant: NDY
AWLY consists of three distinct building zones, connected by two stair and lift lobbies. Retail is located on the ground floor level with four stories of office area above. There is a basement car park and plant room area located on level 5.
Tool: Green Star NZ Office Built 2009
Building Owner: AWLY Investments Limited
GSAP: Rochelle Ade
Project location: 287-293 Durham Street, Christchurch
Project Manager: Warren and Mahoney
Main Contractor: Arrow International
Architects: Warren and Mahoney
Structural Engineer: Beca
Civil Engineer: Beca
Building Services Engineer: Beca
Acoustic Consultants: Acoustic Engineering Services
6 storey A-grade office building with ground floor retail and hospitality. Building C will be designed to target a 5 star Green Star base build rating NZGBC Green Star Office 2009 and a 4 star Certified NABERSNZ Base Building rating and will use artesian source heating and cooling coupled with EC fan coil units to provide heating and cooling to the office and function spaces.
Tool: Green Star NZ Office Design 2009
Building Owner: The Terrace on Avon Limited
GSAP: Ben Masters & Alan Barbour, Beca
Project location: Corner of Oxford and Cashel Street, Christchurch
Project Manager: RCP
Main Contractor: TBC
Architects: Jasmax
Structural Engineer : Aurecon
Civil Engineer: Aurecon
Building Services Engineer : Beca
Acoustic Consultants : TBC