Green Star Technical Clarification Rulings
Technical Clarifications for Green Star represent our answers to Technical Questions submitted by projects, and provide further guidance and reference to others. The list is regularly updated.
There are two types of Technical Clarifications listed in the table below:
General Clarifications
These are extensions to the guidance provided in the Submission Guidelines. They clarify and sometimes supersede the original Credit Criteria or
Compliance Requirements. General Clarifications set precedent for future project teams to follow. Should a project team wish to apply a general clarification to its project, there is no requirement for further Technical Questions to be submitted. NZGBC Assessors will also use them as precedents to assess submissions.
Project Specific Clarifications
These are published as references for other projects but, unlike General Clarifications, they do not set precedent. They often relate to special
situations where multiple prerequisites exist for a particular project and are less likely to reoccur to another project. Therefore, rulings set for Project Specific Clarifications are often conditional and will likely vary for other projects. Each project still needs to submit its own Technical Questions and provides evidence relating to its own building in order to have a similar ruling approved for that specific building.
Should you wish to apply any Technical Clarification for legacy rating tools to your projects, please submit a Technical Question to the NZGBC to
explain why and how it applies. You can access the online Technical Question form here
| Technical Question Title | Tool Version | Date Released | Credit Name | Sub-credit Name | TC Link |
|---|---|---|---|---|---|
| Industrial Guidance - Additional | DABv1 | September 2021 | 0 - General, 10 - Acoustic Comfort, 12 - Visual Comfort, 17 - Sustainable Transport | General, Reverberation, Glare reduction | Link |
|
Approved Ruling: Please see the following clarifications for the Industrial Guidance in addition to the TC issued in June 2021: 10.2 Reverberation - Warehouse floor and distribution areas can be excluded from the assessable areas for the reverberation credit. 17C Prescriptive Pathway: Industrial - This pathway only applies to industrial projects located in regional areas where cycling to work was not practical. When this pathway is adopted, it must be adopted in full. Where industrial projects are located in urban areas, seeking compliance through this industrial pathway will not be acceptable. 12.0 – Glare Reduction (12.1 Glare Reduction from the NZ version of Design and As-Built Submission Guidelines) - When the guidance for this credit in the Industrial Guidance is adopted, external loading dock areas need to be included as part of the assessable areas, even though they are not typically considered primary spaces. It is important to address glare reduction for external loading dock areas when many building occupants work at the loading dock. |
|||||