Green Star Technical Clarification Rulings
Technical Clarifications for Green Star represent our answers to Technical Questions submitted by projects, and provide further guidance and reference to others. The list is regularly updated.
There are two types of Technical Clarifications listed in the table below:
General Clarifications
These are extensions to the guidance provided in the Submission Guidelines. They clarify and sometimes supersede the original Credit Criteria or
Compliance Requirements. General Clarifications set precedent for future project teams to follow. Should a project team wish to apply a general clarification to its project, there is no requirement for further Technical Questions to be submitted. NZGBC Assessors will also use them as precedents to assess submissions.
Project Specific Clarifications
These are published as references for other projects but, unlike General Clarifications, they do not set precedent. They often relate to special
situations where multiple prerequisites exist for a particular project and are less likely to reoccur to another project. Therefore, rulings set for Project Specific Clarifications are often conditional and will likely vary for other projects. Each project still needs to submit its own Technical Questions and provides evidence relating to its own building in order to have a similar ruling approved for that specific building.
Should you wish to apply any Technical Clarification for legacy rating tools to your projects, please submit a Technical Question to the NZGBC to
explain why and how it applies. You can access the online Technical Question form here
| Technical Question Title | Tool Version | Date Released | Credit Name | Sub-credit Name | TC Link |
|---|---|---|---|---|---|
| Construction and Demolition Waste Reporting Criteria v2.0 and Template | Green Star Buildings NZ, DABv1, DABv1.1 | July 2026 | 22 - Construction and Demolition Waste, 2 - Responsible Construction | Construction and Demolition Waste | Link |
|
Approved Ruling: NZGBC has launched a dedicated Construction and Demolition (C&D) Waste Resource Hub, providing Green Star project teams with access to the latest guidance documents, reporting templates, list of waste contractors, CDSF and LVF that have a valid CVS and supporting resources.
Effective immediately, all Green Star projects pursuing the C&D Waste or Responsible Construction credits are required to use the new Green Star C&D Waste Credit Template when preparing and submitting evidence for assessment.
As part of this release, NZGBC has published the Construction and Demolition Waste Reporting Criteria v2.0 (WRC v2.0).
WRC v2.0 transitional ruling This ruling applies to Green Star projects registered under Design & As Built NZ v1.0, Design & As Built NZ v1.1 or Green Star Buildings NZ v1.0. Projects that commenced construction before 1 April 2027 Projects that commenced construction before 1 April 2027 may continue to report construction and demolition waste outcomes on a basis consistent with WRC v1.1 for the duration of the project. For the purposes of this ruling, a project is considered to have commenced construction before 1 April 2027 where activity forming part of the Green Star project works has occurred on the project site under the control of the main contractor before this date. Commencement must be evidenced by either: - an invoice demonstrating activity at the Green Star project site, such as the delivery or collection of a waste bin; or - a payment claim to the client demonstrating that project works occurred on the Green Star project site before 1 April 2027. Where a Construction and Demolition Sorting Facility (CDSF) transitions to WRC v2.0 reporting, an eligible project may apply the CDSF's average facility-wide diversion rate for mixed C&D waste for the 12-month period immediately preceding its transition to WRC v2.0 to subsequent mixed C&D waste processed by that CDSF. Alternatively, if available, the CDSF may provide a monthly facility-wide diversion rate in line with WRC v1.1. Projects that commence construction on or after 1 April 2027 Projects that commence construction on or after 1 April 2027 must use WRC v2.0 reporting and the associated diversion outcomes provided by their Waste Contractors and CDSFs. Project teams should be aware that the revised methodology may result in lower reported diversion rates for some projects. This is because WRC v2.0 requires mixed C&D waste recovery performance to be reported separately from overall facility recovery rates. This does not necessarily reflect poorer recovery performance, but rather a more transparent and accurate reporting methodology.
To avoid unexpected impacts on project outcomes, NZGBC encourages project teams to engage with their Waste Contractor and CDSF early in the project lifecycle to understand how the revised methodology may influence diversion targets and credit achievement.
The C&D Waste Resource Hub will be regularly updated as new guidance, templates, and industry resources become available.
Green Star C&D Waste Resource Hub: https://nzgbc.org.nz/construction-demolition-waste
|
|||||