Homestar Technical Clarification Rulings
How to most efficiently use this page:
1) Filter for the relevant tool version
2) If known, use the credit name field to search for credit keywords or corresponding credit number - please note, this field will ONLY search the "Credit Name" field
3) Use your CTRL+F to search keywords on the page
| Technical Question Title | Tool Version | Date Released | Credit Name | Tool Category | TC Link |
|---|---|---|---|---|---|
| TQ139 Waste Minimisation from Offsite Construction | v4.1 | September 2021 | WST | Link | |
|
Approved Ruling: The TQ requesting 3 Points for WST-1 based on total onsite waste sent to landfill (kg per m2 of site) is within 10 kg/m2 although no quantification is available for waste generated during offsite construction, is accepted. To be clear WST-1 in Homestar v4.1 (which this project is registered under) only accounts for waste generated on site, as waste from offsite assembled components are often difficult to quantify, AND reporting from overseas* suggest that offsite construction helps significantly reduce waste from construction. Hence this project is eligible for points to be awarded solely based on waste generated onsite. |
|||||