Green Star Technical Clarification Rulings
Technical Clarifications for Green Star represent our answers to Technical Questions submitted by projects, and provide further guidance and reference to others. The list is regularly updated.
There are two types of Technical Clarifications listed in the table below:
General Clarifications
These are extensions to the guidance provided in the Submission Guidelines. They clarify and sometimes supersede the original Credit Criteria or
Compliance Requirements. General Clarifications set precedent for future project teams to follow. Should a project team wish to apply a general clarification to its project, there is no requirement for further Technical Questions to be submitted. NZGBC Assessors will also use them as precedents to assess submissions.
Project Specific Clarifications
These are published as references for other projects but, unlike General Clarifications, they do not set precedent. They often relate to special
situations where multiple prerequisites exist for a particular project and are less likely to reoccur to another project. Therefore, rulings set for Project Specific Clarifications are often conditional and will likely vary for other projects. Each project still needs to submit its own Technical Questions and provides evidence relating to its own building in order to have a similar ruling approved for that specific building.
Should you wish to apply any Technical Clarification for legacy rating tools to your projects, please submit a Technical Question to the NZGBC to
explain why and how it applies. You can download the Technical Question form here
| Technical Question Title | Tool Version | Date Released | Credit Name | Sub-credit Name | |
|---|---|---|---|---|---|
| Shower Water Efficiency Requirement with 1 Star of WELS Category F | DABv1 | November 2020 | 18 - Potable Water | Sanitary Fixture Efficiency | |
|
Approved Ruling: For showers, the water efficiency requirement is within one star of the Category F under WELS rating, which means showers must be either: • 3 Star Range E (6.0 - 7.5 L/min); or, • 3 Star Range F (4.5 - 6.0 L/min); or, • 4 Star Range E (6.0 - 7.5 L/min); or, • 4 Star Range F (4.5 - 6.0 L/min) Note that a 3 Star WELS rating high pressure shower sitting at the range of 7.5-9L/m isn’t compliant. |
|||||
| Warehouse Floor Glare Reduction | DABv1 | April 2024 | 12 - Visual Comfort | Glare reduction | |
|
Approved Ruling: For credit 12.1 Glare Reduction, the warehouse floor is included when it is identified as primary space, see the industrial space definitions on page 9 of the Industrial Guidance. If the warehouse is used for distribution or storage then it can be excluded from credit 12.1 as it is secondary or tertiary, not primary, space. The exception to the primary area nomination for credit 12.1 is loading docks which are required to comply regardless of their nomination (primary, secondary, tertiary or external). To summarise, credit 12.1 applies to primary warehouse space, primary office space and loading docks. Similarly credit 12.2 applies to primary warehouse and primary office space only. Where an industrial project is a speculative build (i.e. where the tenant is unknown) then the warehouse space shall be considered primary and included within the nominated space for credit 12.1 and 12.2 as a primary space. To determine the shading requirement for external loading docks projects can either use compliance method 12.1A or 12.1C (noting method 12.1B is for internal blinds and therefore not suitable). Fixed external shading may be required to achieve compliance with credit 12.1, depending on the orientation of the loading docks. With loading docks being a source of pollutants into the warehouse space (from vehicle exhaust fumes) it is recommended that the project team consider this impact when designing the shading features for the loading docks, particularly when also targeting credit 9. If fixed shading is applied tightly around the loading dock, this could increase pollutant concentrations within the warehouse space. Noting however that loading docks are not an acceptable fresh air inlet for credit 9 due to exhaust pollution contaminating the incoming air. Normal working hours for the warehouse will either be as specified by the tenant or where the tenant is unknown should be assumed as 4am-11pm (in line with occupancies for an industrial working space with >1 shift as per Table 47 in the GHG Modelling Guidelines). Additional guidance regarding breezeways: The compliance of a breezeway with the requirements of 12.1 will depend on the design and orientation of the breezeway, and location of the loading dock points along the breezeway. It is up to the project team to analyse the shading from direct sunlight provided by the breezeway through method 12.1A or 12.1C to show compliance with the credit and present this analysis clearly within their submission. With any breezeway design good ventilation should be considered alongside the glare requirements, particularly where projects are targeting both credit 12 and credit 9. If a breezeway is designed to be closed occasionally (e.g. if roller doors are installed which are open during deliveries and closed other times) then this space could be considered internal and the project team would need to include it within the area definition form, justifying how it has been defined within the area definition |
|||||
| Determining Peak Transport Time | DABv1 | November 2020 | 17 - Sustainable Transport | Sustainable Transport | |
|
Approved Ruling: In less populated areas where buses do not start until after 6:30am then the start of the peak morning period may be taken as the second bus time for first compliant bus route. For example, if there are three bus routes that start at 6:45am, 7am and 7:15am and each run every half an hour then the peak morning period would be taken as 7:15am to 9:15am. The latest peak morning period that may be used is 7:30am to 9:30am. Time between services should then be calculated using the determined peak morning period as per the examples on page 4 of the Public Transport Calculator Guide. When determining if a route is compliant the Public Transport Calculator Guide states that more than half of the services need to be within the time period to be compliant, however achieving exactly 50% would be considered compliant. The average interval is to be calculated as the mean as per the Public Transport Calculator Guide. Numbers can be rounded up or down, for example 30.4mins can be considered 30mins. |
|||||
| Definition of Mixed-User for Electricity Assessment | DABv1 | November 2020 | 16 - Peak Electricity Demand Reduction | Peak Electricity Demand Reduction | |
|
Approved Ruling: The current definition for Mixed Use Projects set in credit 16 Peak Electricity Demand Reduction refers to the NCC (the Australian Building Code) usage classification. As a clarification for New Zealand projects, the definition is amended as below: “A mixed-use project or building is deemed to be a building in which no single New Zealand Building Code Clause A1 Classified Use accounts for more than 80% of the building gross floor area (GFA), excluding car parks, etc.” |
|||||
| Statutory Minimums Excuded from Shower Count | DABv1 | October 2019 | 17 - Sustainable Transport | Active Transport Facilities | |
|
Approved Ruling: Showers located in statutorily required accessible bathrooms cannot be claimed in the count for shower facilities. Extra bathrooms/showers with disability access, not required statutorily, which meet the Sustainable Transport credit requirements can be counted. |
|||||
| Refurbishments with Unaltered Stormwater Peak Discharge | DABv1 | June 2022 | 25 - Stormwater | Stormwater Peak Discharge | |
|
Approved Ruling: For existing buildings, refurbishment projects with no alterations to the stormwater catchment can be awarded 1 point for Stormwater Peak Discharge by providing a letter from the building owner stating that there have been no changes to the stormwater catchment (e.g. roofs, site landscaping, existing stormwater infrastructure etc.) as part of the project and therefore there is no increase in the post-development peak stormwater flows. |
|||||
| NSW Environmental Management Systems Guidelines for EMP Compliance | DABv1 | July 2020 | 7 - Responsible Construction Practices | EMP | |
|
Approved Ruling: Please find the latest version of the NSW Environmental Management Systems Guidelines for EMP compliance requirements here. The requirements for EMPs, as outlined within the NSW Environmental Management Systems Guidelines, are considered best practice. The edition of the guidelines current at the time of construction must be used. |
|||||
| VOC Limit Eligibility Criteria | DABv1, DABv1.1 | October 2019 | 13 - Indoor Pollutants | Paints, Adhesives, Sealants and Carpets | |
|
Approved Ruling: A product compliance rate of 95% or higher (with regards to VOC limits) must be demonstrated for each of the following categories separately in order to be eligible for (1) point:
|
|||||
| Onsite Testing Results where WELS Certification not available | DABv1 | April 2022 | 18 - Potable Water | Potable water | |
|
Approved Ruling: Where a project cannot provide WELS certifications to demonstrate compliance for the Potable Water credit, onsite testing results can be acceptable in place of WELS certifications. In this case, the onsite testing should follow the Appendix F Onsite Compliance Schedule in the Homestar v5 Technical Manual. https://nzgbc.org.nz/hubfs/HSTG03%20Homestar%20Technical%20Manual%20v5_0_3.pdf
|
|||||
| Green Cleaning Policy | DABv1 | November 2020 | 29 - Innovation | Global Sustainability | |
|
Approved Ruling: Can projects target the 6.1 Green Cleaning Policy credit from Green Star - Performance under the Innovation category? Yes. Projects pursuing a certification under Green Star - Design & As Built, Green Star - Interiors may target credit 6.1 Green Cleaning Policy from Green Star - Performance v1.2 under the Global Sustainability credit. One (1) point is available where all compliance requirements for credit 6.1 Green Cleaning Policy from the Green Star - Performance v1.2 submission guidelines are addressed. This is on the condition that the Green Cleaning Policy must be implemented for a minimum of 10 years. |
|||||
| Reverberation Compliance | DABv1 | October 2019 | 10 - Acoustic Comfort | Reverberation | |
|
Approved Ruling: Compliance with the reverberation criterion should be demonstrated for all common areas. |
|||||
| Responsible Party for Sustainable Initiative Delivery | DABv1 | October 2019 | 7 - Responsible Construction Practices | High Quality Staff Support | |
|
Approved Ruling: Who can be considered a 'responsible party' to deliver training on sustainable practices and initiatives? 'Responsible Party' refers to people employed by the contractor or subcontractor, who are involved in decision making and will be key to the delivery of the Green Star certification in their relevant trades. There is no requirement for a Responsible Party to be office based, site based or a combination, as long as they have relevant participation in the project. There are no specific roles defined or excluded from this definition. A contractor's Sustainability Consultant may be considered Responsible Party for the purposes of this Innovation Challenge. |
|||||
| Scope of Credit 20.3 | DABv1, INTv1 | January 2022 | 20 - Responsible Building Materials | Permanent Formwork, Pipes, Flooring, Blinds and Cables | |
|
Approved Ruling: The NZGBC confirms that the scope of credit 20.3 Permanent formwork, pipes, flooring, blinds and cables under Green Star - Design & As Built or credit 20.2 under Green Star - Interiors, includes any mechanical ductwork that contain PVC pipes or cables. This must be accounted for when demonstrating compliance under the credit criteria as stated below: 1 point is available where 90% (by cost) of all permanent formwork, pipes, flooring, blinds and cables in a project either:
Where the cost of PVC products in the project is less than 1% of the Project Contract Value this criterion is made ‘Not Applicable’. For more information please refer to the Literature Review and Best Practice Guidelines Life cycle of PVC building products found on the GBCA website. |
|||||
| Innovation Point for using 750 MPa Steel Fitment | DABv1 | October 2019 | 19 - Life Cycle Assessment/Impacts | Life Cycle Impacts – Steel | |
|
Approved Ruling: Projects may pursue one (1) innovation point through Credit 30A Innovative Technology or Process where the use of 750 MPa steel fitments of a reduced diameter are installed in lieu of equivalent 500 MPa fitments** (also known as ligatures) under the following conditions:
Documentation requirements
30A Innovative Technology and Process submission template, specifying the pathway achieved 19A or 19B.2B. |
|||||
| Waste Minimisation in New Developments | DABv1 | June 2021 | 8 - Operational Waste | Operational Waste | |
|
Approved Ruling: A Technical Question should be submitted to the NZGBC if there is any uncertainty in showing compliance to either pathway for the credit Operational Waste. Note that The City of Sydney’s Policy for Waste Minimisation in New Developments has been updated to a newer version, which provide guidance to more building types other than offices. The new version is recognised as a third-party best practice guideline for operational waste credit compliance. |
|||||
| Low Emission Vehicle Infrastructure | DABv1, DABv1.1 | November 2020 | 17 - Sustainable Transport | Low Emission Vehicle Infrastructure | |
|
Approved Ruling: Low Emission Vehicle Infrastructure would apply only to carparks which will need to be installed for a new buildings. |
|||||
| Relevance of Plant Density | DABv1 | October 2019 | 23 - Ecological Value | Ecological Value | |
|
Approved Ruling: Does plant density in green roofs and vertical gardens affect the ecological value credit? No, plant density is irrelevant to the calculation performed by the Ecological Value calculator. The credit recognises the surface area of the soil/substrate in which the plants are rooted, not the total area covered by the plant foliage, nor the plant density. |
|||||
| Healthcare Guidance | DABv1, DABv1.1 | August 2022 | 0 - General | General | |
|
Approved Ruling: The Healthcare Guidance requires shell spaces to be defined as primary spaces. However, for hospital projects, some areas may not be completed before Practical Completion but do have nominal fitout design in place. In this case, it is acceptable for project teams to subdivide the shell spaces into primary, secondary and tertiary spaces based on the nominal design rather than defining the entire shell spaces as primary. Note that project teams need to confirm that the proposed design will eventually be built as it is. |
|||||
| Grouping Metering | DABv1, DABv1.1 | January 2023 | 6 - Metering and Monitoring | Metering | |
|
Approved Ruling: For Industrial office/warehouse buildings can each load over 5% of the total power supply to the building be grouped to the function and each group be individually metered? Yes, the requirement is for distinct, common and major uses to be metered as per the description on page 86 ‘where the electrical load for a single item exceeds 5% of total electricity (power) demand for the project, or 100kW, it must be individually metered.’ The wording “electricity (power) demand” should be taken to mean electricity consumption in kWh. |
|||||
| Conditional Acceptance that Continuous Simulation Load Modelling not Required | DABv1, DABv1.1 | November 2020 | 25 - Stormwater | Stormwater Pollution Targets | |
|
Approved Ruling: It is conditionally accepted that the requirement for continuous simulation load modelling is not required in this instance provided the installed engineering design is consistent with the referenced assumptions in CCC WWDG Table 6-6 and the Australian guidance document for infiltration (biofiltration) treatment Adoption Guidelines for Stormwater Biofiltration Systems. With respect to designing for the ‘first flush’, this should be defined by the applicant in accordance with relevant design standards and the design developed to ensure all of this flow, with suitable allowance for blockage / clogging of the designed media, is treated before overflow occurs. It is noted that the Greenstar Table 25.1 pollution removal requirements are all in excess of the minimum expected removal rates presented in CCC WWDG Table 6-6 and it will therefore need to be demonstrated that the design and installation is best practice to achieve the required pollution removal targets with adequate maintenance plans in place to ensure continued performance over the longer term |
|||||
| Previous leniency not a precedent | DABv1 | May 2021 | 0 - General | General | |
|
Approved Ruling: Individual credits for every project are assessed on the content and quality of the submission as per the requirements in the Technical Manual. Assessors reserve the right to not award points to non-compliant submissions, even if points have been awarded in similar situations in the past. Assessors are not obligated to award points due to previous precedents, as the precedents may no longer be correct or relevant. |
|||||
| Financial Transparency Innovation Challenge | DABv1, DABv1.1 | December 2024 | 29 - Innovation | Innovation Challenge | |
|
Approved Ruling: The information provided for the Financial Transparency Innovation Challenge is used to provide relevant information to the construction industry on Green Star costs. The Innovation requires the client/project team to participate in a NZGBC report that publicizes anonymous data from project teams. Note that all results published in potential future reports are completely anonymous and are in aggregate form. No project, owner or consultant will be identifiable from the results of the Financial Transparency Innovation aggregated results when they are published by the NZGBC. We highly encourage all Green Star projects to pursue this innovation challenge. |
|||||
| Energy Consumption and GHG Calculation Guide | DABv1.1 | April 2023 | 15 - Greenhouse Gas Emissions | Greenhouse Gas Emissions | |
Approved Ruling:
|
|||||
| AA1000 Licensed Assurance Provider | DABv1 | October 2019 | 20 - Responsible Building Materials | Permanent Formwork, Pipes, Flooring, Blinds and Cables | |
|
Approved Ruling: An AA1000 Licensed Assurance Provider can provide Auditor Verification for Green Star PVC certification. The AA1000 Account-Ability Standards, an international methodology for sustainability-related assurance engagements, is considered an ‘equivalent national or international auditor accreditation system’ as endorsed by the Vinyl Council. A Licenced-Assurance Provider under this standard is qualified to sign off on PVC best practice audit/assurance documentation. |
|||||
| Industrial Guidance - Additional | DABv1 | September 2021 | 0 - General, 10 - Acoustic Comfort, 12 - Visual Comfort, 17 - Sustainable Transport | General, Reverberation, Glare reduction | |
|
Approved Ruling: Please see the following clarifications for the Industrial Guidance in addition to the TC issued in June 2021: 10.2 Reverberation - Warehouse floor and distribution areas can be excluded from the assessable areas for the reverberation credit. 17C Prescriptive Pathway: Industrial - This pathway only applies to industrial projects located in regional areas where cycling to work was not practical. When this pathway is adopted, it must be adopted in full. Where industrial projects are located in urban areas, seeking compliance through this industrial pathway will not be acceptable. 12.0 – Glare Reduction (12.1 Glare Reduction from the NZ version of Design and As-Built Submission Guidelines) - When the guidance for this credit in the Industrial Guidance is adopted, external loading dock areas need to be included as part of the assessable areas, even though they are not typically considered primary spaces. It is important to address glare reduction for external loading dock areas when many building occupants work at the loading dock.
|
|||||
| DABv1 Potable Water Calculator to the Healthcare Potable Water Calculator | DABv1 | February 2023 | 18 - Potable Water | Potable water | |
|
Approved Ruling: The v1.0 Potable Water Calculator had been updated to provide clear NZ rainfall data and was released in 2022. For healthcare projects using the Healthcare guidance, please copy and paste the rainfall data from the up-to-date v1.0 Potable Water Calculator to the Healthcare Potable Water Calculator for consistency. |
|||||
| Measuring Compliance for Building Reuse: Structure Reuse | DABv1 | October 2019 | 19 - Life Cycle Assessment/Impacts | Life Cycle Impact- Building Reuse | |
|
Approved Ruling: The 30% or 60% measurement requirements for demonstrating compliance with Credit 19B.3.2 Structure Reuse is based on gross building volume, as per the compliance requirements. |
|||||
| Fire Protection System Test Water criterion (18B.5) is ‘Not Applicable’ for some projects | DABv1 | November 2020 | 18 - Potable Water | Fire System Test Water | |
|
Approved Ruling: The current clause regarding projects that are deemed not applicable under the Fire Protection System Test Water criterion (18B.5) refers to Part E of the NCC (the Australian Building Code) on page 188 for Design and As Built. As a clarification for New Zealand projects, the following amended clause will replace the original clause: “The Fire Protection System Test Water criterion (18B.5) is deemed ‘Not Applicable’ for projects where: • A sprinkler system is not required under The New Zealand Building Code, or • A sprinkler system is not provided by the project team and does not include a water-based fire protection system.” |
|||||
| Household Travel Survey | DABv1 | August 2021 | 17 - Sustainable Transport | Sustainable Transport | |
|
Approved Ruling: Please be advised that project teams cannot use the Household Travel Survey or other NZ Stats data to demonstrate compliance through the performance pathway for Sustainable Transport. The data used in the performance pathway calculator is grouped by SA2, and so is specific to a small sub-regional portion of the country. Using the Household Travel Survey at a regional level is less accurate, as it can include areas with better public transport, or better walking/facilities than the specific sub-region in which the assessed project sits. |
|||||
| Enhancements to Existing Features in ‘Ecological Value Calculator’ | DABv1, DABv1.1 | January 2025 | 23 - Ecological Value | Ecological Value | |
|
Approved Ruling: The ecological enhancements to existing features of ecological value can be included in the ‘Ecological Value Calculator’ and can be counted twice but the application should be supported with sufficient explanation and justification and accompanied by relevant plans and illustrations. Where enhancements form only a portion of a feature then the enhancement area entered into the ‘Ecological Value Calculator’ should reflect only the proportion of improvement. |
|||||
| Indoor Environment Quality credits | DABv1 | November 2020 | 0 - General, 9 - Indoor Air Quality, 10 - Acoustic Comfort, 11 - Lighting Comfort, 12 - Visual Comfort, 14 - Thermal Comfort | General, Provision of Outdoor Air, Internal Noise Levels, Reverberation, Minimum Lighting Comfort, General Illuminance and Glare Reduction, Surface Illuminance, Thermal Comfort, Advanced Thermal Comfort, Glare reduction, Localised Lighting Control | |
|
Approved Ruling: For the following Indoor Environment Quality credits, compliance need only be demonstrated across 95% of the nominated area:
For residential buildings, please note that the 95% compliance criteria need to be met for individual dwellings, not as an overall GFA of nominated area. Refer to the submission guidelines for which space types are considered nominated area in each credit. |
|||||
| Internal Ambient Noise | DABv1 | September 2021 | 10 - Acoustic Comfort | Internal Noise Levels | |
|
Approved Ruling: The Submission Guidelines stipulate that “one (1) point is awarded where project teams demonstrate that internal ambient noise levels, in the nominated area, are no more than 5dB(A) above the lower figure in the range recommended in Table 1 of AS/NZS 2107:2016.” For the avoidance of doubt, where a single figure dBA value is provided in AS/NZS2107, the noise target shall be no larger than that single dBA value.
|
|||||
| Ultra-Low VOC paints by volume | DABv1 | October 2019 | 29 - Innovation | Improving on Green Star Benchmarks | |
|
Approved Ruling: Ultra-Low VOC paints can be calculated by volume rather than cost. |
|||||
| Weighted Sound Reduction | DABv1 | June 2021 | 10 - Acoustic Comfort | Acoustic Separation | |
|
Approved Ruling: The following guidance applies to the weighted sound reduction index for partitions: The partition between the spaces should be constructed to achieve a weighted sound reduction index (dB Rw) of:
At least 50 through floors between occupied spaces |
|||||
| Respite Spaces | DABv1 | May 2023 | 29 - Innovation | Innovation Challenge | |
|
Approved Ruling: For projects using the DAB NZv1.0 Healthcare Guidance: Innovation Challenge – Respite Spaces. While projects are encouraged to have individual spaces for the purpose of respite, spaces such as Staff rooms, Whānau spaces and Patient lounges are still considered respite spaces even if occupants are regularly moving in and out of the space. |
|||||
| Prime Agricultural Land | DABv1 | November 2020 | 24 - Sustainable Sites | Conditional Requirement: Ecological Protection and Highly Productive Land | |
|
Approved Ruling: Both the Green Star Design and As Built and Communities tools have as a conditional requirement that the land to be built on is not Prime Agricultural Land. The Government is proposing a National Policy Statement for Highly Productive Land (NPS-HPL) to improve the way highly productive land is managed under the Resource Management Act 1991 - more information here. In light of our recent survey and developments in central government around this issue NZGBC has decided the forthcoming Highly Productive Land guidance is very likely to be used in Green Star. From this point forward any mention of “Prime Agricultural Land” will be replaced with “Highly Productive Land.” Once the final NPS-HPL Statement is issued, if any significant modifications to this TQ is necessary, an updated TQ will be issued. The criteria for Highly Productive Land will be: 1. The capability and versatility of the land to support primary production based on the LUC classification system - currently this will be LUC1-3 land using this website using the "NZLRI Land Use Capability" layer 2. Highly Productive Land excludes all urban zoned areas and all future urban zoned areas in district plans. Project teams are highly encouraged to ensure their site fulfil the minimal requirements in the Sustainable Sites credit prior to expending time on a project. If there are any questions about this credit the project team is highly encouraged to contact NZGBC for clarification |
|||||
| GSAP and ICA | DABv1, DABv1.1 | April 2023 | 2 - Commissioning and Tuning, 1 - Green Star Accredited Professional | Independent Commissioning Agent, Accredited Professional | |
|
Approved Ruling: Projects may engage a Green Star Accredited Professional (GSAP) and Independent Commissioning Agent (ICA) from the same organization on the condition that: 1. The project team can sufficiently demonstrate that each role is being performed independent of the other. 2. The compliance requirement for both Credit 1.0 Green Star Accredited Professional and Credit 2.4 – Independent commissioning Agent are met. The below documentation is recommended to demonstrate sufficient independence between the GSAP and ICA:
NB: The ICA cannot be from the same firm as the consultants involved in the design or installation of the nominated systems |
|||||
| Formaldehyde Emission Limits | DABv1, DABv1.1 | July 2022 | 13 - Indoor Pollutants | Engineering Wood Products | |
|
Approved Ruling: 1 point can be awarded when 95% of engineered wood products meet the formaldehyde emission limits by area. Project teams are not expected to calculate all the surface areas of each engineered wood product. Only the largest face of each product is to be calculated for credit compliance. |
|||||
| Surface Illuminance in Retail Spaces | DABv1 | July 2021 | 11 - Lighting Comfort | Surface Illuminance | |
|
Approved Ruling: Retail projects may mark credit criterion 11.3 Surface Illuminance as 'Not Applicable' (NA) due to the specific requirements for lighting design within retail fitouts. It is noted that the outcome targeted by the ‘Surface Illuminance’ criteria of the Lighting Comfort credit is not always relevant in retail spaces which focus on the lighting of product and creating visual interest. |
|||||
| Minimum Requirement as Pre-requisite to Other Credits (credit 22.2) | DABv1 | May 2021 | 22 - Construction and Demolition Waste | Reporting Accuracy | |
|
Approved Ruling: This TC is released to supersede the previous TC issued in May 2020 for credit 22. The Design and As-Built and Interiors tool, Construction and Demolition waste Credit 22 has a minimum requirement that must be met BEFORE the other credits can be approved. The “Reporting Accuracy" credit criteria states the following: “The minimum requirement is met where the waste contractors and waste processing facilities servicing the project demonstrate compliance with the Green Star Construction and Demolition Waste Reporting Criteria.” Environmental Choice New Zealand (ECNZ) issued (EC-59-19) Construction & Demolition Waste Services specification (found here https://environmentalchoice.org.nz/specifications/ec-59-19/ ) fulfils the Reporting Criteria minimum requirement. Therefore, if all the associated waste contractors and waste processing facilities are awarded a licence under this specification then the project meets the minimum requirement for this credit. Projects using ECNZ-licensed waste contractors also qualify for 1 credit related to 70% diversion from landfill, provided the ECNZ audit is completed withing two months after Practical Completion of the project in accordance with clause 6.3 c) of EC-59-19. |
|||||
| ISO standard 18504 | DABv1 | November 2020 | 24 - Sustainable Sites | Contamination and Hazardous Materials | |
|
Approved Ruling: Can the ISO standard 18504 can be used as a Best Practice Remediation strategy for Site Decontamination? Yes, for the purposes of site decontamination in Green Star, the ISO standard 18504: Soil quality: Sustainable Remediation can be used an alternative to the current standard referenced in the submission guidelines: “A Framework for Assessing the Sustainability of Soil and Groundwater Remediation” |
|||||
| Exceeding Green Star Benchmarks | DABv1 | October 2019 | 19 - Life Cycle Assessment/Impacts | Life Cycle Impacts | |
|
Approved Ruling: In Regard to 19A - Life Cycle Impacts in Green Star - Design & As Built v1.0 NZGBC clarifies the following:
NZGBC clarifies that exceeding benchmark points can only be achieved if the cumulative reduction from modules other than B6 exceeds 3 points. Please note that under this version of the rating tool no more than 2 points can be achieved for an 'Exceeding Green Star Benchmarks' claim.
It is confirmed that reference case excludes all other modules, and therefore the cumulative impact reduction is relative to the sum of impacts from module A4 and A5. |
|||||
| Soft Landings Framework | DABv1 | November 2020 | 29 - Innovation | Market Transformation | |
|
Approved Ruling: The following guidance is provided for projects wanting to target the Soft Landings Framework innovation point in the Commissioning and Tuning credit. Minimum Compliance : All compliance requirements as per Credit 2: Commissioning and Tuning must be achieved prior to pursuing the 'Soft Landings Framework Innovation credit'. Documentation Requirements Design Review Submission
As Built Submission
|
|||||
| Thermally Treated Timber | DABv1 | June 2021 | 29 - Innovation | Innovation- Thermally treated timber | |
|
Approved Ruling: Thermally treated timber may be recognised through an innovation application for a large proportion of thermally treated timber used in a project. To target this innovation, project teams will need to define a percentage benchmark for the thermally treated timber used in construction. In order to define the benchmark, project teams are required to: • Describe briefly the assumptions behind the benchmark, and any process that was used to establish them. • If existing data was used, or a literature review was performed, this must be included. If the assumptions rely on previous experience by the project team, including professional estimates, this must be stated. • Describe the process being undertaken to ensure the defined benchmarks are being met. • Demonstrate that the benchmarks were achieved in the project’s As Built submission. For some projects, this may be able to be demonstrated at Tender stage, for the project’s Design submission. |
|||||
| Definition for Eligible Project | DABv1 | November 2020 | 0 - General | General | |
|
Approved Ruling: The current definition for Eligible Project in the section of Glossary refers to the NCC (the Australian Building Code) usage classification. As a clarification for New Zealand projects, the definition is amended as below: “Eligible Project - Any New Zealand-based new build or major refurbishment project of any eligible typology (see above for NCC Building usage classifications and relevant New Zealand Building Code Clause A1 Classified Uses), with a minimum occupancy of 1FTE, and meeting all other eligibility criteria available on the NZGBC website, may target a Green Star NZ – Design & As-built Certified Rating using the Submission Guidelines and this Addendum Document as guidance.” |
|||||
| Global Sustainability | DABv1, DABv1.1 | July 2024 | 29 - Innovation | Global Sustainability | |
|
Approved Ruling: Can projects target the 6.1 Green Cleaning Policy credit from Green Star - Performance under the Innovation category? Yes. Projects pursuing a certification under Green Star - Design & As Built, Green Star - Interiors may target credit 6.1 Green Cleaning Policy from Green Star - Performance v1.2 under the Global Sustainability credit. One (1) point is available where all compliance requirements for credit 6.1 Green Cleaning Policy from the Green Star - Performance v1.2 submission guidelines are addressed. This is on the condition that the Green Cleaning Policy must be implemented for a minimum of 10 years. |
|||||
| Integrated Public Art | DABv1 | July 2021 | 29 - Innovation | Global Sustainability | |
Approved Ruling:
|
|||||
| Alternative to Demonstrate Idle and Standby Energy Performance | DABv1, DABv1.1 | April 2023 | 15 - Greenhouse Gas Emissions | Greenhouse Gas Emissions | |
|
Approved Ruling: Projects may demonstrate compliance with the 'lift idle and standby energy' requirement from the Vertical Transportation criteria by demonstrating that the following energy saving features have been incorporated in the lift specification:
This guidance is based on industry feedback that most lifts cannot currently achieve performance level 1 in accordance with ISO 25746-2 for lift idle and standby energy. Documentation Requirements: Please provide the following in your submission:
|
|||||
| Correction to Percentage Benchmark and Innovation | DABv1 | July 2020 | 22 - Construction and Demolition Waste | Percentage Benchmark | |
|
Approved Ruling: In the Appendix for Non-Innovation claims, the Submission Guidelines state that improving on the benchmark for Construction and Demolition Waste: Percentage Benchmark will not be awarded an Innovation. This is contradictory and incorrect. The Innovation point is available to be awarded. The last line of the Submission Guidelines regarding Construction and Demolition Waste: Percentage Benchmark can be ignored. |
|||||
| Ducted Split System Fan Coil Units | DABv1 | May 2022 | 9 - Indoor Air Quality | Ventilation System Attributes | |
|
Approved Ruling: Are ducted split system fan coil units (DX split/VRF/VRV) required to provide access to both sides of fan coil units? No, project teams do not have to provide access to both sides of coils for cleaning and maintenance purposes of such systems, provided the following conditions are met: 1. Design teams may provide access to the upstream side of fan coil units where the coils are protected by a filter rated at MERV 8 or higher and:
and 2. For fan coil units or air handling units located within a ceiling void, in addition to the above criteria, the project team must fully demonstrate safe access for cleaning and maintenance. This may include:
Documentation Requirements: Please provide the following in your submission:
|
|||||